OMT Energy Enterprises – Services & Expertise

May 26th, 2017 No Comments   Posted in energy expert

OMT Energy Enterprises – Services & Expertise

Marcial T. Ocampo is pleased to announce his availability for new job opportunities starting August 1, 2017. I am confident to meet the challenges of being the VP for Business Development, VP Corporate Planning, President and CEO of any enterprise and in the oil industry, power industry or energy industry. My encompassing knowledge in accounting, finance, planning, financial modeling, project finance and project finance modeling, human relations and management shall be my source of strength and competence in leading a business enterprise..

Education:

Elementary     :      Dologon Laboratory School

Musuan, Bukidnon

1958 – 1964

Valedictorian

High School   :      San Sebastian College

Claro M. Recto, Manila

1964 – 1968

Salutatorian

College          :        B. S. Chemical Engineering

University of the Philippines, Diliman, Quezon City

1968 – 1973

2nd Place (87.75%) – Chemical Engineering Board 1973

Post Graduate :        M. S. Chemical Engineering

University of the Philippines, Diliman, Quezon City

Thesis: “The Assimilative Capacity of Some Rivers in the Philippines, an LP Model”

1974 – 1978

M. S. Combustion and Energy

University of Leeds, United Kingdom

Thesis: “The Performance and Emission Characteristics of a Methanol-Fueled Spark Ignition Engine”

1979-1980

Expertise:

Executive Management • Team Development & Leadership • Corporate Planning & Strategy • Business Model & Development • Project Management • Corporate Finance & Financial Modeling • Negotiation Effectiveness • Regulatory Management & Registration

Services:

Coal Mine Project Finance Modeling and Feasibility Study

Supply/Demand/Price Forecasting with Monte Carlo Simulation (MCS)

Deterministic and Stochastic Project Finance Modeling with MCS

Integrated Wind Speed, Power Curves, Capacity Factor and Project Finance with MCS

Conventional and Renewable Energy Statistics (historical, forecast)

Renewable and Conventional Energy Supply/Demand and Tariff Studies

Renewable Energy Resource Assessment (wind, solar, mini-hydro) and Optimal Configuration

Clean Coal and Conventional Coal Project Finance and Feasibility Studies

Petroleum Supply/Demand and Pump Price Studies

LNG Market Study and Fuel Substitution Studies

Biomass Power Barrier Removal

Mini-hydro Power Design, Costing, Modeling and Feasibility Studies

Tri-Generation (Power, Heat, Cooling) Optimization & Financial Modeling

Mid-Term and Final Term Review of UNDP Projects

Energy & Business Development

Oil, Energy & Electricity Pricing

Feed-In Tariff Calculation for Renewable Energy/Electricity

Refinery, Utilities, Distribution & Transportation Optimization

Refinery & Petrochem Process Modeling & Optimization

Optimal Power & Load Dispatch

Project Finance, Power Plant Modeling & Financial Modeling

Market, Technical & Economic Feasibility Studies

Dam Simulation Modeling & Studies

General Ledger Accounting System

Loans Processing System

Business Modeling & Corporate Planning

Oil Industry Retail & Distribution Expansion Studies

Small Scale Project Finance Models (diesel, hydro, biomass, wind, solar, cogeneration, hybrid-RE)

Large Scale Project Finance Models (oil, coal, geothermal, gas turbines, combined cycles)

Specialties:

Computer Programming

Relational Database Management

Process Simulation & Modeling

Optimization & Linear Programming

Project Finance & Financial Modeling

Market, Technical & Economic Feasibility Studies

Business Planning & Corporate Planning

Energy Audits & Energy Demand Management

Power Generation Technology Selection

Email me for more details:

energydataexpert@gmail.com

mars_Ocampo@yahoo.com

Visit us to know more about products and services:

www.energydataexpert.com

www.energytechnologyexpert.com

Download my latest resume/CV.

_CV of Marcial Ocampo_Expanded Format_May 22, 2017

 

Tidal Current Power Plant Model in Various Currencies

May 24th, 2017 No Comments   Posted in financial models

Tidal Current Power Plant Model in Various Currencies

Finding a project finance model template for renewable energy such as ocean current or tidal current power plant using several currencies relative to the US DOLLAR is now made easy.

A good discussion on the various forms of ocean energy (wave, thermal, tidal and current) is available in the power point presentation below:

Ocean Energy (Power Pt)

Following are downloadable sample models for a tidal current power plant in various international currencies that are convertible to local currencies.

The exchange rates are based on the March 14, 2017 conversion table provided by www.xe.com.

The sample model is based on the advanced (regulator) template that is easy to use and understand.

Try the samples below (paste the links below into your browser or Google the demo model):

OCEAN CURRENT OR TIDAL CURRENT POWER PLANT MODELS

Exchange rates are for the month of March 2017.

 

UNITED STATES OF AMERICA – US DOLLAR (1 USD = 1.0000 USD)

ADV Tidal Current Model3_30 MW (USD) – demo5b

Taiwan – Taiwan New Dollar (1 USD = 30.8661 TWD)

ADV Tidal Current Model3_30 MW (TWD) – demo5b

Thailand – Thai Baht (1 USD = 35.2789 THB)

ADV Tidal Current Model3_30 MW (THB) – demo5b

Philippines – Philippine Peso (1 USD = 50.2557 PHP)

ADV Tidal Current Model3_30 MW (PHP) – demo5b

Malaysia – Malaysian Ringgit (1 USD = 4.44976 MYR)

ADV Tidal Current Model3_30 MW (MYR) – demo5b

Indonesia – Indonesian Rupiah (1 USD = 13372.00 IDR)

ADV Tidal Current Model3_30 MW (IDR) – demo5b

India – Rupee (1 USD = 65.4177 INR)

ADV Tidal Current Model3_30 MW (INR) – demo5b

GREAT BRITAIN POUND – GBP (1 USD = 0.817605 GBP)

ADV Tidal Current Model3_30 MW (GBP) – demo5b

EUROPEAN UNION – EURO (1 USD = 1.0765 EUR)

ADV Tidal Current Model3_30 MW (EUR) – demo5b

China – Chinese Yuan Renminbi (1 USD = 6.91388 CNY)

ADV Tidal Current Model3_30 MW (CNY) – demo5

 

OTHER CURRENCIES

The reader may request for other international currencies from the Energy Technology Selection Expert and Project Finance Modeling Expert.

Just email me the Country, name of currency and the base rate and forward rate exchange currency per US DOLLAR, and perhaps the OPEX and CAPEX escalation for the Country and the US escalation to assume too.

OTHER TECHNOLOGIES

There are many more renewable (solar CSP, solar PV, wind offshore, wind onshore, mini-hydro, OTEC), conventional (oil genset, oil thermal, coal thermal, petcoke thermal, gas thermal, combined cycle GT, simple cycle GT, geothermal, large hydro), nuclear power, and waste heat recovery systems (gasoline engine, diesel engine, and gas turbines using natural gas, landfill gas, propane, LPG).

Email me for more details and how to order off-line:

energydataexpert@gmail.com

To order and download the USD and PHP models, paste the link to your browser:

Advanced Tidal Current Project Finance Model (ver. 3) – 30 mw

Visit our on-line digital store to order on-line

www.energydataexpert.com

www.energytechnologyexpert.com

 

Biomass and Other Power Plant Models in THAILAND BAHT (THB) – with financial ratios for risk analysis

May 15th, 2017 No Comments   Posted in financial models

Biomass and Other Power Plant Models in THAILAND BAHT (THB) – with financial ratios for risk analysis

The Thailand Energy & Power Market is among the leading investment opportunities in Asia for renewable, conventional, energy storage, and waste heat recovery power generation technologies.

Be familiar with the Thailand energy and power costs by downloading the project finance models.

Finding a project finance model template for biomass power plant (cogeneration, direct combustion, gasification, waste-to-energy, IGCC) and other power plants in THAILAND BAHT CURRENCY is now made easy.

The models also include financial ratios to identify potential risks during the project development stage, such as:

a) Liquidity Ratios (current ratio, quick ratio)

b) Solvency Ratios (debt to equity ratio, equity ratio, debt ratio)

c) Efficiency Ratios (asset turnover ratio, inventory turnover ratio)

d) Profitability Ratios (gross margin ratio, EBITDA margin ratio, return on assets ratio, net profit to assets ratio, return on owners’ equity, return on capital employed ratio)

e) Market Prospect Ratios (earnings per share, price earnings ratio, dividend payout ratio, dividend yield ratio)

Following are downloadable THB models for a biomass power plant and other power plants.

The exchange rates are based on the March 14, 2017 conversion table provided by www.xe.com.

The sample model is based on the advanced (regulator) template that is easy to use and understand.

Try the samples below (paste the links below into your browser or Google the demo model):

POWER PLANT MODELS IN THAILAND BAHT CURRENCY

Exchange rates are for the month of March 2017.

THAILAND – BAHT (1 USD = 34.7179 THB)

 

ADV Biomass Cogeneration Model3 (THB) – demo5b

ADV Biomass Direct Combustion Model3 (THB) – demo5b

ADV Biomass Gasification Model3 (THB) – demo5b

ADV Biomass IGCC Model3 (THB) – demo5b

ADV Biomass WTE Model3 (THB) – demo5b

ADV Biomass WTE Model3 – pyrolysis (THB) – demo5b

ADV Mini-Hydro Model3 (THB) – demo5b

ADV Ocean Thermal Model3_10 MW (THB) – demo5b

ADV Ocean Thermal Model3_50 MW (THB) – demo5b

ADV Solar PV 1 mw Model3 (THB) – demo5b

ADV Solar PV 25 mw Model3 (THB) – demo5b

ADV Concentrating Solar Power (CSP) Model3 (THB) – demo5b

ADV Wind Offshore Model3 (THB) – demo5b

ADV Wind Onshore Model3 (THB) – demo5b

 

ADV Coal-Fired CFB Thermal Model3_50 MW (THB) – demo5b

ADV Coal-Fired CFB Thermal Model3_135 MW (THB) – demo5b

ADV Coal-Fired PC Subcritical Thermal Model3 (THB) – demo5b

ADV Coal-Fired PC Supercritical Thermal Model3 (THB) – demo5b

ADV Coal-Fired PC Ultrasupercritical Thermal Model3 (THB) – demo5b

 

ADV Diesel Genset Model3 (THB) – demo5b

ADV Fuel Oil Genset Model3 (THB) – demo5b

ADV Fuel Oil Thermal Model3 (THB) – demo5b

ADV Natgas Combined Cycle Model3 (THB) – demo5b

ADV Natgas Simple Cycle Model3 (THB) – demo5b

ADV Natgas Thermal Model3 (THB) – demo5b

ADV Geo Thermal Model3 (THB) – demo5b

ADV Large Hydro Model3 (THB) – demo5b

ADV Petcoke-Fired PC Subcritical Thermal Model3 (THB) – demo5b

ADV Nuclear PHWR Model3 (THB) – demo5b

 

ADV Coal-Fired CFB Thermal Model3_50 MW CHP (THB) – demo5b

ADV Diesel Genset and Waste Heat Boiler Model3 (THB) – demo5b

ADV Fuel Oil Genset and Waste Heat Boiler Model3 (THB) – demo5b

ADV Gasoline Genset and Waste Heat Boiler Model3 (THB) – demo5b

ADV Propane Simple Cycle and Waste Heat Boiler Model3 (THB) – demo5b

ADV Simple Cycle and Waste Heat Boiler Model3 (THB) – demo5b

 

OTHER CURRENCIES

The reader may request for other international currencies from the Energy Technology Selection Expert and Project Finance Modeling Expert.

Just email me the Country, name of currency and the base rate and forward rate exchange currency per US DOLLAR, and perhaps the OPEX and CAPEX escalation for the Country and the US escalation to assume too.

OTHER TECHNOLOGIES

There are many more renewable (solar CSP, solar PV, wind offshore, wind onshore, mini-hydro, OTEC), conventional (oil genset, oil thermal, coal thermal, petcoke thermal, gas thermal, combined cycle GT, simple cycle GT, geothermal, large hydro), nuclear power, and waste heat recovery systems (gasoline engine, diesel engine, and gas turbines using natural gas, landfill gas, propane, LPG).

Email me for more details and how to order off-line:

energydataexpert@gmail.com

Visit our on-line digital store to order on-line

www.energydataexpert.com

www.energytechnologyexpert.com

 

Biomass and Other Power Plant Models in MALAYSIA RINGGIT (MYR) – with financial ratios for risk analysis

May 13th, 2017 No Comments   Posted in financial models

Biomass and Other Power Plant Models in MALAYSIA RINGGIT (MYR) – with financial ratios for risk analysis

The Malaysia Energy & Power Market is among the leading investment opportunities in Asia for renewable, conventional, energy storage, and waste heat recovery power generation technologies.

Be familiar with the Malaysia energy and power costs by downloading the project finance models.

Finding a project finance model template for biomass power plant (cogeneration, direct combustion, gasification, waste-to-energy, IGCC) and other power plants in MALAYSIA RINGGIT CURRENCY is now made easy.

The models also include financial ratios to identify potential risks during the project development stage, such as:

a) Liquidity Ratios (current ratio, quick ratio)

b) Solvency Ratios (debt to equity ratio, equity ratio, debt ratio)

c) Efficiency Ratios (asset turnover ratio, inventory turnover ratio)

d) Profitability Ratios (gross margin ratio, EBITDA margin ratio, return on assets ratio, net profit to assets ratio, return on owners’ equity, return on capital employed ratio)

e) Market Prospect Ratios (earnings per share, price earnings ratio, dividend payout ratio, dividend yield ratio)

Following are downloadable MYR models for a biomass power plant and other power plants.

The exchange rates are based on the March 14, 2017 conversion table provided by www.xe.com.

The sample model is based on the advanced (regulator) template that is easy to use and understand.

Try the samples below (paste the links below into your browser or Google the demo model):

POWER PLANT MODELS IN MALAYSIA RINGGIT CURRENCY

Exchange rates are for the month of March 2017.

MAYLAYSIA – RINGGIT (1 USD = 4.4310 MYR)

 

ADV Biomass Cogeneration Model3 (MYR) – demo5b

ADV Biomass Direct Combustion Model3 (MYR) – demo5b

ADV Biomass Gasification Model3 (MYR) – demo5b

ADV Biomass IGCC Model3 (MYR) – demo5b

ADV Biomass WTE Model3 – pyrolysis (MYR) – demo5b

ADV Biomass WTE Model3 (MYR) – demo5b

ADV Mini-Hydro Model3 (MYR) – demo5b

ADV Ocean Thermal Model3_10 MW (MYR) – demo5b

ADV Ocean Thermal Model3_50 MW (MYR) – demo5b

ADV Solar PV 1 mw Model3 (MYR) – demo5b

ADV Solar PV 25 mw Model3 (MYR) – demo5b

ADV Concentrating Solar Power (CSP) Model3 (MYR) – demo5b

ADV Wind Offshore Model3 (MYR) – demo5b

ADV Wind Onshore Model3 (MYR) – demo5b

 

ADV Coal-Fired CFB Thermal Model3_50 MW (MYR) – demo5b

ADV Coal-Fired CFB Thermal Model3_135 MW (MYR) – demo5b

ADV Coal-Fired PC Subcritical Thermal Model3 (MYR) – demo5b

ADV Coal-Fired PC Supercritical Thermal Model3 (MYR) – demo5b

ADV Coal-Fired PC Ultrasupercritical Thermal Model3 (MYR) – demo5b

 

ADV Diesel Genset Model3 (MYR) – demo5b

ADV Fuel Oil Genset Model3 (MYR) – demo5b

ADV Fuel Oil Thermal Model3 (MYR) – demo5b

ADV Geo Thermal Model3 (MYR) – demo5b

ADV Large Hydro Model3 (MYR) – demo5b

ADV Natgas Combined Cycle Model3 (MYR) – demo5b

ADV Natgas Simple Cycle Model3 (MYR) – demo5b

ADV Natgas Thermal Model3 (MYR) – demo5b

ADV Petcoke-Fired PC Subcritical Thermal Model3 (MYR) – demo5b

ADV Nuclear PHWR Model3 (MYR) – demo5b

 

ADV Coal-Fired CFB Thermal Model3_50 MW CHP (MYR) – demo5b

ADV Diesel Genset and Waste Heat Boiler Model3 (MYR) – demo5b

ADV Fuel Oil Genset and Waste Heat Boiler Model3 (MYR) – demo5b

ADV Gasoline Genset and Waste Heat Boiler Model3 (MYR) – demo5b

ADV Propane Simple Cycle and Waste Heat Boiler Model3 (MYR) – demo5b

ADV Simple Cycle and Waste Heat Boiler Model3 (MYR) – demo5b

 

OTHER CURRENCIES

The reader may request for other international currencies from the Energy Technology Selection Expert and Project Finance Modeling Expert.

Just email me the Country, name of currency and the base rate and forward rate exchange currency per US DOLLAR, and perhaps the OPEX and CAPEX escalation for the Country and the US escalation to assume too.

OTHER TECHNOLOGIES

There are many more renewable (solar CSP, solar PV, wind offshore, wind onshore, mini-hydro, OTEC), conventional (oil genset, oil thermal, coal thermal, petcoke thermal, gas thermal, combined cycle GT, simple cycle GT, geothermal, large hydro), nuclear power, and waste heat recovery systems (gasoline engine, diesel engine, and gas turbines using natural gas, landfill gas, propane, LPG).

Email me for more details and how to order off-line:

energydataexpert@gmail.com

Visit our on-line digital store to order on-line

www.energydataexpert.com

www.energytechnologyexpert.com

 

Biomass and Other Power Plant Models in INDIA RUPEE (INR) – with financial ratios for risk analysis

May 11th, 2017 No Comments   Posted in financial models

Biomass and Other Power Plant Models in INDIA RUPEE (INR) – with financial ratios for risk analysis

The India Energy & Power Market is among the leading investment opportunities in Asia for renewable, conventional, energy storage, and waste heat recovery power generation technologies.

Be familiar with the India energy and power costs by downloading the project finance models.

Finding a project finance model template for biomass power plant (cogeneration, direct combustion, gasification, waste-to-energy, IGCC) and other power plants in INDIA RUPEE CURRENCY is now made easy.

The models also include financial ratios to identify potential risks during the project development stage, such as:

a) Liquidity Ratios (current ratio, quick ratio)

b) Solvency Ratios (debt to equity ratio, equity ratio, debt ratio)

c) Efficiency Ratios (asset turnover ratio, inventory turnover ratio)

d) Profitability Ratios (gross margin ratio, EBITDA margin ratio, return on assets ratio, net profit to assets ratio, return on owners’ equity, return on capital employed ratio)

e) Market Prospect Ratios (earnings per share, price earnings ratio, dividend payout ratio, dividend yield ratio)

Following are downloadable INR models for a biomass power plant and other power plants.

The exchange rates are based on the March 14, 2017 conversion table provided by www.xe.com.

The sample model is based on the advanced (regulator) template that is easy to use and understand.

Try the samples below (paste the links below into your browser or Google the demo model):

POWER PLANT MODELS IN INDIA RUPEE CURRENCY

Exchange rates are for the month of March 2017.

INDIA – RUPEE (1 USD = 65.4177 INR)

 

ADV Biomass Cogeneration Model3 (INR) – demo5b

ADV Biomass Direct Combustion Model3 (INR) – demo5b

ADV Biomass Gasification Model3 (INR) – demo5b

ADV Biomass IGCC Model3 (INR) – demo5b

ADV Biomass WTE Model3 (INR) – demo5b

ADV Biomass WTE Model3 – pyrolysis (INR) – demo5b

ADV Mini-Hydro Model3 (INR) – demo5b

ADV Ocean Thermal Model3_10 MW (INR) – demo5b

ADV Ocean Thermal Model3_50 MW (INR) – demo5b

ADV Solar PV 1 mw Model3 (INR) – demo5b

ADV Solar PV 25 mw Model3 (INR) – demo5b

ADV Concentrating Solar Power (CSP) Model3 (INR) – demo5b

ADV Wind Offshore Model3 (INR) – demo5b

ADV Wind Onshore Model3 (INR) – demo5b

 

ADV Coal-Fired CFB Thermal Model3_50 MW (INR) – demo5b

ADV Coal-Fired CFB Thermal Model3_135 MW (INR) – demo5b

ADV Coal-Fired PC Subcritical Thermal Model3 (INR) – demo5b

ADV Coal-Fired PC Supercritical Thermal Model3 (INR) – demo5b

ADV Coal-Fired PC Ultrasupercritical Thermal Model3 (INR) – demo5b

 

ADV Diesel Genset Model3 (INR) – demo5b

ADV Fuel Oil Genset Model3 (INR) – demo5b

ADV Fuel Oil Thermal Model3 (INR) – demo5b

ADV Geo Thermal Model3 (INR) – demo5b

ADV Large Hydro Model3 (INR) – demo5b

ADV Natgas Combined Cycle Model3 (INR) – demo5b

ADV Natgas Simple Cycle Model3 (INR) – demo5b

ADV Natgas Thermal Model3 (INR) – demo5b

ADV Petcoke-Fired PC Subcritical Thermal Model3 (INR) – demo5b

ADV Nuclear PHWR Model3 (INR) – demo5b

 

ADV Coal-Fired CFB Thermal Model3_50 MW CHP (INR) – demo5b

ADV Diesel Genset and Waste Heat Boiler Model3 (INR) – demo5b

ADV Fuel Oil Genset and Waste Heat Boiler Model3 (INR) – demo5b

ADV Gasoline Genset and Waste Heat Boiler Model3 (INR) – demo5b

ADV Propane Simple Cycle and Waste Heat Boiler Model3 (INR) – demo5b

ADV Simple Cycle and Waste Heat Boiler Model3 (INR) – demo5b

 

OTHER CURRENCIES

The reader may request for other international currencies from the Energy Technology Selection Expert and Project Finance Modeling Expert.

Just email me the Country, name of currency and the base rate and forward rate exchange currency per US DOLLAR, and perhaps the OPEX and CAPEX escalation for the Country and the US escalation to assume too.

OTHER TECHNOLOGIES

There are many more renewable (solar CSP, solar PV, wind offshore, wind onshore, mini-hydro, OTEC), conventional (oil genset, oil thermal, coal thermal, petcoke thermal, gas thermal, combined cycle GT, simple cycle GT, geothermal, large hydro), nuclear power, and waste heat recovery systems (gasoline engine, diesel engine, and gas turbines using natural gas, landfill gas, propane, LPG).

Email me for more details and how to order off-line:

energydataexpert@gmail.com

Visit our on-line digital store to order on-line

www.energydataexpert.com

www.energytechnologyexpert.com

 

Biomass and Other Power Plant Models in INDONESIA RUPIAH (IDR) – with financial ratios for risk analysis

May 9th, 2017 No Comments   Posted in financial models

Biomass and Other Power Plant Models in INDONESIA RUPIAH (IDR) – with financial ratios for risk analysis

The Indonesia Energy & Power Market is among the leading investment opportunities in Asia for renewable, conventional, energy storage, and waste heat recovery power generation technologies.

Be familiar with the Indonesia energy and power costs by downloading the project finance models.

Finding a project finance model template for biomass power plant (cogeneration, direct combustion, gasification, waste-to-energy, IGCC) and other power plants in INDONESIA RUPIAH CURRENCY is now made easy.

The models also include financial ratios to identify potential risks during the project development stage, such as:

a) Liquidity Ratios (current ratio, quick ratio)

b) Solvency Ratios (debt to equity ratio, equity ratio, debt ratio)

c) Efficiency Ratios (asset turnover ratio, inventory turnover ratio)

d) Profitability Ratios (gross margin ratio, EBITDA margin ratio, return on assets ratio, net profit to assets ratio, return on owners’ equity, return on capital employed ratio)

e) Market Prospect Ratios (earnings per share, price earnings ratio, dividend payout ratio, dividend yield ratio)

Following are downloadable IDR models for a biomass power plant and other power plants.

The exchange rates are based on the March 14, 2017 conversion table provided by www.xe.com.

The sample model is based on the advanced (regulator) template that is easy to use and understand.

Try the samples below (paste the links below into your browser or Google the demo model):

POWER PLANT MODELS IN INDONESIA RUPIAH CURRENCY

Exchange rates are for the month of March 2017.

INDONESIA – RUPIAH (1 USD = 13324.49 IDR)

 

ADV Biomass Cogeneration Model3 (IDR) – demo5b

ADV Biomass Direct Combustion Model3 (IDR) – demo5b

ADV Biomass Gasification Model3 (IDR) – demo5b

ADV Biomass IGCC Model3 (IDR) – demo5b

ADV Biomass WTE Model3 (IDR) – demo5b

ADV Biomass WTE Model3 – pyrolysis (IDR) – demo5b

ADV Mini-Hydro Model3 (IDR) – demo5b

ADV Ocean Thermal Model3_10 MW (IDR) – demo5b

ADV Ocean Thermal Model3_50 MW (IDR) – demo5b

ADV Solar PV 1 mw Model3 (IDR) – demo5b

ADV Solar PV 25 mw Model3 (IDR) – demo5b

ADV Concentrating Solar Power (CSP) Model3 (IDR) – demo5b

ADV Wind Offshore Model3 (IDR) – demo5b

ADV Wind Onshore Model3 (IDR) – demo5b

 

ADV Coal-Fired CFB Thermal Model3_50 MW (IDR) – demo5b

ADV Coal-Fired CFB Thermal Model3_135 MW (IDR) – demo5b

ADV Coal-Fired PC Subcritical Thermal Model3 (IDR) – demo5b

ADV Coal-Fired PC Supercritical Thermal Model3 (IDR) – demo5b

ADV Coal-Fired PC Ultrasupercritical Thermal Model3 (IDR) – demo5b

 

ADV Diesel Genset Model3 (IDR) – demo5b

ADV Fuel Oil Genset Model3 (IDR) – demo5b

ADV Fuel Oil Thermal Model3 (IDR) – demo5b

ADV Geo Thermal Model3 (IDR) – demo5b

ADV Large Hydro Model3 (IDR) – demo5b

ADV Natgas Combined Cycle Model3 (IDR) – demo5b

ADV Natgas Simple Cycle Model3 (IDR) – demo5b

ADV Natgas Thermal Model3 (IDR) – demo5b

ADV Petcoke-Fired PC Subcritical Thermal Model3 (IDR) – demo5b

ADV Nuclear PHWR Model3 (IDR) – demo5b

 

ADV Coal-Fired CFB Thermal Model3_50 MW CHP (IDR) – demo5b

ADV Diesel Genset and Waste Heat Boiler Model3 (IDR) – demo5b

ADV Fuel Oil Genset and Waste Heat Boiler Model3 (IDR) – demo5b

ADV Gasoline Genset and Waste Heat Boiler Model3 (IDR) – demo5b

ADV Propane Simple Cycle and Waste Heat Boiler Model3 (IDR) – demo5b

ADV Simple Cycle and Waste Heat Boiler Model3 (IDR) – demo5b

 

OTHER CURRENCIES

The reader may request for other international currencies from the Energy Technology Selection Expert and Project Finance Modeling Expert.

Just email me the Country, name of currency and the base rate and forward rate exchange currency per US DOLLAR, and perhaps the OPEX and CAPEX escalation for the Country and the US escalation to assume too.

OTHER TECHNOLOGIES

There are many more renewable (solar CSP, solar PV, wind offshore, wind onshore, mini-hydro, OTEC), conventional (oil genset, oil thermal, coal thermal, petcoke thermal, gas thermal, combined cycle GT, simple cycle GT, geothermal, large hydro), nuclear power, and waste heat recovery systems (gasoline engine, diesel engine, and gas turbines using natural gas, landfill gas, propane, LPG).

Email me for more details and how to order off-line:

energydataexpert@gmail.com

Visit our on-line digital store to order on-line

www.energydataexpert.com

www.energytechnologyexpert.com

 

Biomass and Other Power Plant Models in UNITED STATES (USD) and PHILIPPINE (PHP) CURRENCIES – with financial ratios for risk analysis

May 4th, 2017 No Comments   Posted in financial models

Biomass and Other Power Plant Models in UNITED STATES (USD) and PHILIPPINE (PHP) CURRENCIES – with financial ratios for risk analysis

Finding a project finance model template for biomass power plant (cogeneration, direct combustion, gasification, waste-to-energy, IGCC) and other power plants in US DOLLAR and PHILIPPINE PESOS (as an example, but you can also model other currencies if you know the exchange rate to one US DOLLAR) is now made easy.

The models also include financial ratios to identify potential risks during the project development stage, such as:

a) Liquidity Ratios (current ratio, quick ratio)

b) Solvency Ratios (debt to equity ratio, equity ratio, debt ratio)

c) Efficiency Ratios (asset turnover ratio, inventory turnover ratio)

d) Profitability Ratios (gross margin ratio, EBITDA margin ratio, return on assets ratio, net profit to assets ratio, return on owners’ equity, return on capital employed ratio)

e) Market Prospect Ratios (earnings per share, price earnings ratio, dividend payout ratio, dividend yield ratio)

Following are downloadable USD models for a biomass power plant and other power plants.

The exchange rates are based on the March 14, 2017 conversion table provided by www.xe.com.

The sample model is based on the advanced (regulator) template that is easy to use and understand.

Try the samples below (paste the links below into your browser or Google the demo model):

POWER PLANT MODELS IN UNITED STATES CURRENCY AND PHILIPPINE CURRENCY

Exchange rates are for the month of March 2017.

UNITED STATES – DOLLAR (1 USD = 1.0000 USD)

PHILIPPINES – PESO (1 USD = 50.2971 PHP)

 

The first link is the demo (locked) version while the next link (italics) will allow you to order and remit payment via PayPal and download immediately the models (USD, PHP) for each power generation technology.

 

RENEWABLE ENERGY POWER GENERATION TECHNOLOGIES

 

ADV Biomass Cogeneration Model3 (USD) – demo5b

http://energydataexpert.com/shop/power-generation-technologies/biomass-cogeneration-project-finance-model-ver-3-in-usd-and-php-currency/

ADV Biomass Direct Combustion Model3 (USD) – demo5b

http://energydataexpert.com/shop/power-generation-technologies/biomass-direct-combustion-project-finance-model-ver-3-in-usd-and-php-currency/

ADV Biomass Gasification Model3 (USD) – demo5b

http://energydataexpert.com/shop/power-generation-technologies/biomass-gasification-project-finance-model-ver-3-in-usd-and-php-currency-2/

ADV Biomass IGCC Model3 (USD) – demo5b

http://energydataexpert.com/shop/power-generation-technologies/biomass-igcc-project-finance-model-ver-3-in-usd-and-php-currency/

ADV Biomass WTE Model3 (USD) – demo5b

http://energydataexpert.com/shop/power-generation-technologies/biomass-wte-project-finance-model-ver-3-in-usd-and-php-currency/

ADV Biomass WTE Model3 – pyrolysis (USD) – demo5b

http://energydataexpert.com/shop/power-generation-technologies/biomass-wte-pyrolysis-project-finance-model-ver-3-in-usd-and-php-currency/

ADV Mini-Hydro Model3 (USD) – demo5b

http://energydataexpert.com/shop/power-generation-technologies/mini-hydro-project-finance-model-ver-3-in-usd-and-php-currency/

ADV Ocean Thermal Model3_10 MW (USD) – demo5b

http://energydataexpert.com/shop/power-generation-technologies/otec-10-mw-project-finance-model-ver-3-in-usd-and-php-currency-copy/

ADV Ocean Thermal Model3_50 MW (USD) – demo5b

http://energydataexpert.com/shop/power-generation-technologies/otec-50-mw-project-finance-model-ver-3-in-usd-and-php-currency-copy-2/

ADV Solar PV 1 mw Model3 (USD) – demo5b

http://energydataexpert.com/shop/power-generation-technologies/solar-pv-1-mw-project-finance-model-ver-3-in-usd-and-php-currency/

ADV Solar PV 25 mw Model3 (USD) – demo5b

http://energydataexpert.com/shop/power-generation-technologies/solar-pv-25-mw-project-finance-model-ver-3-in-usd-and-php-currency/

ADV Concentrating Solar Power (CSP) Model3 (USD) – demo5b

http://energydataexpert.com/shop/power-generation-technologies/csp-400-mw-project-finance-model-ver-3-in-usd-and-php-currency/

ADV Wind Offshore Model3 (USD) – demo5b

http://energydataexpert.com/shop/power-generation-technologies/off-shore-wind-power-project-finance-model-ver-3-in-usd-and-php-currency/

ADV Wind Onshore Model3 (USD) – demo5b

http://energydataexpert.com/shop/power-generation-technologies/on-shore-wind-power-project-finance-model-ver-3-in-usd-and-php-currency/

 

CONVENTIONAL, FOSSIL AND NUCLEAR POWER GENERATION TECHNOLOGIES

 

ADV Coal-Fired CFB Thermal Model3_50 MW (USD) – demo5b

http://energydataexpert.com/shop/power-generation-technologies/cfb-coal-fired-50-mw-power-project-finance-model-ver-3-in-usd-and-php-currency/

ADV Coal-Fired CFB Thermal Model3_135 MW (USD) – demo5b

http://energydataexpert.com/shop/power-generation-technologies/cfb-coal-fired-135-mw-power-project-finance-model-ver-3-in-usd-and-php-currency/

ADV Coal-Fired PC Subcritical Thermal Model3 (USD) – demo5b

http://energydataexpert.com/shop/power-generation-technologies/pc-subcritical-400-mw-power-project-finance-model-ver-3-in-usd-and-php-currency/

ADV Coal-Fired PC Supercritical Thermal Model3 (USD) – demo5b

http://energydataexpert.com/shop/power-generation-technologies/pc-supercritical-400-mw-power-project-finance-model-ver-3-in-usd-and-php-currency/

ADV Coal-Fired PC Ultrasupercritical Thermal Model3 (USD) – demo5b

http://energydataexpert.com/shop/power-generation-technologies/pc-ultrasupercritical-650-mw-power-project-finance-model-ver-3-in-usd-and-php-currency/

 

ADV Diesel Genset Model3 (USD) – demo5b

http://energydataexpert.com/shop/power-generation-technologies/ci-diesel-genset-50-mw-power-project-finance-model-ver-3-in-usd-and-php-currency/

ADV Fuel Oil Genset Model3 (USD) – demo5b

http://energydataexpert.com/shop/power-generation-technologies/ci-fuel-oil-genset-225-mw-power-project-finance-model-ver-3-in-usd-and-php-currency/

ADV Fuel Oil Thermal Model3 (USD) – demo5b

http://energydataexpert.com/shop/power-generation-technologies/fuel-oil-thermal-300-mw-power-project-finance-model-ver-3-in-usd-and-php-currency/

ADV Geo Thermal Model3 (USD) – demo5b

http://energydataexpert.com/shop/power-generation-technologies/geothermal-50-mw-power-project-finance-model-ver-3-in-usd-and-php-currency/

ADV Large Hydro Model3 (USD) – demo5b

http://energydataexpert.com/shop/power-generation-technologies/large-hydro-500-mw-power-project-finance-model-ver-3-in-usd-and-php-currency/

ADV Natgas Combined Cycle Model3 (USD) – demo5b

http://energydataexpert.com/shop/power-generation-technologies/natural-gas-fired-ccgt-620-mw-power-project-finance-model-ver-3-in-usd-and-php-currency/

ADV Natgas Simple Cycle Model3 (USD) – demo5b

http://energydataexpert.com/shop/power-generation-technologies/natural-gas-fired-ocgt-85-mw-power-project-finance-model-ver-3-in-usd-and-php-currency/

ADV Natgas Thermal Model3 (USD) – demo5b

http://energydataexpert.com/shop/power-generation-technologies/natural-gas-fired-thermal-300-mw-power-project-finance-model-ver-3-in-usd-and-php-currency/

ADV Petcoke-Fired PC Subcritical Thermal Model3 (USD) – demo5b

http://energydataexpert.com/shop/power-generation-technologies/petcoke-fired-thermal-110-mw-power-project-finance-model-ver-3-in-usd-and-php-currency/

ADV Nuclear PHWR Model3 (USD) – demo5b

http://energydataexpert.com/shop/power-generation-technologies/nuclear-1330-mw-power-project-finance-model-ver-3-in-usd-and-php-currency/

 

COMBINED HEAT AND POWER (CHP) AND WASTE HEAT RECOVERY TECHNOLOGIES

 

ADV Coal-Fired CFB Thermal Model3_50 MW CHP (USD) – demo5b

http://energydataexpert.com/shop/power-generation-technologies/cfb-coal-fired-50-mw-chp-power-project-finance-model-ver-3-in-usd-and-php-currency/

ADV Diesel Genset and Waste Heat Boiler Model3 (USD) – demo5b

http://energydataexpert.com/shop/power-generation-technologies/ci-diesel-genset-and-whrb-project-finance-model-ver-3-in-usd-and-php-currency/

ADV Fuel Oil Genset and Waste Heat Boiler Model3 (USD) – demo5b

http://energydataexpert.com/shop/power-generation-technologies/ci-fuel-oil-genset-and-whrb-project-finance-model-ver-3-in-usd-and-php-currency/

ADV Gasoline Genset and Waste Heat Boiler Model3 (USD) – demo5b

http://energydataexpert.com/shop/power-generation-technologies/si-gasoline-genset-and-whrb-project-finance-model-ver-3-in-usd-and-php-currency/

ADV Propane Simple Cycle and Waste Heat Boiler Model3 (USD) – demo5b

http://energydataexpert.com/shop/power-generation-technologies/propane-fired-simple-cycle-gt-and-whrb-project-finance-model-ver-3-in-usd-and-php-currency/

ADV Simple Cycle and Waste Heat Boiler Model3 (USD) – demo5b

http://energydataexpert.com/shop/power-generation-technologies/natgas-fired-simple-cycle-gt-and-whrb-project-finance-model-ver-3-in-usd-and-php-currency/

 

OTHER CURRENCIES

The reader may request for other international currencies from the Energy Technology Selection Expert and Project Finance Modeling Expert.

Just email me the Country, name of currency and the base rate and forward rate exchange currency per US DOLLAR, and perhaps the OPEX and CAPEX escalation for the Country and the US escalation to assume too.

OTHER TECHNOLOGIES

There are many more renewable (solar CSP, solar PV, wind offshore, wind onshore, mini-hydro, OTEC), conventional (oil genset, oil thermal, coal thermal, petcoke thermal, gas thermal, combined cycle GT, simple cycle GT, geothermal, large hydro), nuclear power, and waste heat recovery systems (gasoline engine, diesel engine, and gas turbines using natural gas, landfill gas, propane, LPG).

Email me for more details and how to order off-line:

energydataexpert@gmail.com

Visit our on-line digital store to order on-line

www.energydataexpert.com

www.energytechnologyexpert.com