Subscribe

Buy my project finance models, visit my country, and learn one-on-one to use my models

October 30th, 2011 Posted in financial models

Buy my project finance models, visit my country, and learn one-on-one to use my models

That’s right. Order and buy now my project finance models this November till December and take advantage of my holiday deals.

Once you have paid via PayPal or wire / bank transfer to my local bank account, I will then email to you the project finance model.

Then take the first flight to Manila and I will meet you at the Airport (NAIA Terminals 1, 2 or 3).

Alternatively, send me my airline ticket and hotel booking charge to your account, and I will fly to your work place and conduct the seminar/workshop to you and your other interested staff.

I will then take you to your hotel and conduct the one-on-one seminar/workshop where you will learn project finance and power plant and financial modeling for conventional (hydro, geothermal, coal thermal, oil thermal, gas thermal, combined cycle gas turbines), renewable (biomass, solar, wind, mini-hydro, ocean thermal energy conversion), nuclear and energy storage power generation technologies.

Bring your case data (base case, high, medium or average, and low case) and we will input the data together into the model.  In just 1-2 days, you are now ready to make sophisticated project finance models that include:

1) Input data worksheet

2) Capital cost estimate (construction period) – installed equipment, taxes, project development, working capital, interest during construction

3) Operating & maintenance cost estimate (operating period), insurance, regulatory costs, other costs

4) Financials (revenue, expenses, depreciation schedule, loan amortization schedule, gross margin, depreciation, interest expense, income before tax, income tax, income after tax, add-back depreciation, working capital and salvage value at end of project life, principal repayment, net cash flow, and free cash flow)

5) Calculation of project NPV, IRR and payback

6) Calculation of equity NPV, IRR and payback

7) Balance sheet (before and after dividends payment)

8) Cash flow for debt service and debt service cover ratio

9) Debt service reserve fund

10) Calculation of dividends payable to equity investors

11) Statement of cash flows (ending cash must tally with ending cash balance in the balance sheet)

12) Levelized cost of energy (profit, generation cost breakdown, profit)

13) Financial ratios during the operating period

With the above, you can now write your feasibility study report. I will also teach you how to do power industry analysis, energy and power demand and supply balance and forecasting, risk analysis, and other important information needed in making a bankable feasibility study for submission to a financial institution for possible funding.

Please email me:

mars_ocampo@yahoo.com

or

energydataexpert@gmail.com

Cheers,

Marcial Ocampo

Project Finance Modeling & Business Development

Energy demand and supply balance forecasting

Power plant modeling

Market, technical, environmental, economic and financial feasibility studies

Optimal load dispatch, linear programming and optimization

 

———–

TECHNOLOGY MB  
Cost of Power Generation Technologies.xls 0.129 $129
Levelized cost of electricity.xls 0.153 $153
Latest Feed-in-Tariff Rates for Renewable Energy Technologies.doc 0.047 $47
Wind Turbine Price List.xls 0.605 $605
Power Plant Emission Data and Model:    
Power Plant Emission Calculation Model by mass.xls 0.126 $126
Power Plant Emission Calculation Model by concentration.xls 0.2 $200
NREB Feed-in-Tariff Models for Renewable Energy    
NREB Biomass Cogeneration Model.xls   $1,200
NREB Biomass Gasification Model.xls   $1,200
NREB Biomass Direct Combustion Model.xls   $1,200
NREB Mini-Hydro Model.xls   $1,200
NREB Solar PV Model.xls   $1,200
NREB Wind Model.xls   $1,200
NREB Ocean Thermal Model_10 MW.xls   $1,200
NREB Ocean Thermal Model_50 MW.xls   $1,200
MTO Feed-in-Tariff Models for Renewable Energy    
MTO Fit_biomass cogeneration.xls   $600
MTO Fit_biomass direct combustion.xls   $600
MTO Fit_biomass gasification.xls   $600
MTO Fit_Mini Hydro.xls   $600
MTO Fit_ocean thermal_10 MW.xls   $600
MTO Fit_ocean thermal_50 MW.xls   $600
MTO Fit_solar PV.xls   $600
MTO Fit_wind.xls   $600
Simplified Feed-in-Tariff Models for Renewable Energy (Student Edition)    
Simplified Fit_biomass anaerobic digestion.xls   $300
Simplified Fit_biomass cogeneration.xls   $300
Simplified Fit_biomass gasification.xls   $300
Simplified Fit_biomass direct combustion.xls   $300
Simplified Fit_Mini Hydro.xls   $300
Simplified Fit_ocean thermal_10 MW.xls   $300
Simplified Fit_ocean thermal_50 MW.xls   $300
Simplified Fit_solar PV.xls   $300
Simplified Fit_wind.xls   $300
Renewable Energy Resource Assessment Model    
Wind Energy Resource Assessment Tool_Anemometer Measurement   $1,000
Wind Energy Resource Assessment Tool_3TIER Prediction   $1,000
MTO Project Finance Models:    
proj_diesel genset power plant model.xls   $300
proj_hybrid power plant model (diesel, biomass, mini-hydro, solar, wind).xls   $1,300
proj_oil thermal power plant model.xls   $1,000
proj_coal thermal power plant model (pulverized, CFB, IGCC).xls   $2,000
proj_geothermal power plant model.xls   $2,000
proj_simple cycle GT plant model.xls   $1,500
proj_combined cycle GT plant model.xls   $2,000
proj_nuclear power plant model.xls   $3,000
LP Models for Optimal Load Dispatch    
Optimal Load Dispatch_Luzon_1.xls 0.779 $779
Optimal Load Dispatch_Mindanao_1.xls 0.733 $733
Optimal Load Dispatch_Visayas_1.xls 0.74 $740
LP Model for Trigeneration.xls 0.653 $653

———–

Leave a Reply

XHTML: You can use these tags: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>