Reciprocating (Piston) Engine Project Finance Model Template (Financials Tab) – free demo

Reciprocating (Piston) Engine Project Finance Model Template (Financials Tab) – free demo

This is the latest project finance model template (financials tab or worksheet) that your energy technology selection expert has developed for reciprocating (piston) engine power generation technology. Familiarize with the template and if interested, get the full unlocked version for your immediate use. I can also provide data input service or customize further the model.

Reciprocating diesel engine (using diesel oil and bunker fuel oil) is based on the compression ignition (CI) thermodynamic cycle while the reciprocating gasoline engine (using gasoline, petrol and natural gas) is based on the spark ignition (SI) thermodynamic cycle.

More »

New Best Entrant Project Finance Model with VAT – landfill, diesel, coal, oil, natgas

April 24th, 2010 2 Comments   Posted in financial models

New Best Entrant Project Finance Model with VAT – landfill, diesel, coal, oil, natgas

A new “Best New Entrant” project finance model with value added tax (VAT) has been developed to analyze which of the following technology such as landfill gas to power, diesel engine, coal thermal (pulverized, CFB), oil thermal or natural gas CCGT is the best new entrant providing overall effectiveness in terms of first year tariff and equity returns.

To order, simply proceed to the ENERGY DATA page of this blog and select large scale models, then order via PayPal the desired model.

Alternatively, you may confirm your order via email, then I will email you my local bank details where you may send via wire transfer the payment.

Upon receipt via PayPal or my local bank account, I will then email you two copies of the ordered models.

Regards,

Marcial Ocampo

Energy & Business Development Consultant

More »

Available Project Finance Models with CDM and Renewable Energy Law Incentives

January 15th, 2010 No Comments   Posted in financial models

Available Project Finance Models with CDM and Renewable Energy Law Incentives

I just finished polishing all my project finance models for the following power generation technologies and are now available for actual runs by project developers, researchers and individuals doing business development.  Using the models below will allow user to determine as quickly as possible the “best new entrant” technology applicable to a particular location given the fuel and energy resource available and the electricity tariff prevailing in the area. More »

How to Optimize Power Plant Design and Configuration (technology, capacity, efficiency, location)

January 11th, 2010 2 Comments   Posted in financial models

How to Optimize Power Plant Design and Configuration (technology, capacity, efficiency, location) – see download file for input data

Optimizing the overall project concept during the plant feasibility study and detailed engineering study is a common problem faced by project developers and EPC contractors.  The question commonly asked by project owners from project developers and designers are:

(1) What engine/manufacturer should be considered (e.g. Siemens, Westinghouse, General Electric, Mitsubishi, Alstom, etc)? More »

Biomass, Coal and Oil Thermal, Diesel and CCGT Levelized Tariff, Levelized Cost and Financial Model

November 29th, 2009 2 Comments   Posted in financial models

Biomass, Coal and Oil Thermal, Diesel and CCGT Levelized Tariff, Levelized Cost and Financial Model

The following is a snippet of my state-of-the-art project finance model for calculating levelized tariff, levelized cost of energy, and financial model (generation, fuel requirement, income statement, cash flow statement, balance sheet and financial ratios). More »