Biomass Energy Project Finance Model Template (Financials Tab) – free demo

April 15th, 2016 No Comments   Posted in project finance modeling

Biomass Energy Project Finance Model Template (Financials Tab) – free demo

This is the latest project finance model template (financials tab or worksheet) that your energy technology selection expert has developed for biomass energy (cogeneration, direct combustion, gasification, IGCC, WTE) and all other fossil and thermal power plants (burns fossil fuel). Familiarize with the template and if interested, get the full unlocked version for your immediate use. I can also provide data input service or customize further the model.

More »

CDM Biomass Direct Combustion Model2.xls

June 25th, 2012 No Comments   Posted in renewable energy

CDM Biomass Direct Combustion Model2.xls

In addition to the worksheets found in the ADV models of the regulator, 5 additional tabs or worksheets have been added (Capex, Opex, Revenues, Project IRR and Sensitivity) into the CDM model which is a financial evaluation without taxes (that distort the economic and technical performance) and debt (pure equity investment). For the RE project to benefit from CDM credits, the project IRR should not be more than 15% p.a.

Direct combustion of biomass system (furnace, boiler, steam turbine, generator) is carried out mostly in the countryside where biomass is abundant from agricultural activity such as paddy rice, corn fields, cotton fields, sugar cane fields, tree plantation and municipal solid waste (MSW). A 50-km radius of agricultural land can support around 6-12 MW of biomass power plant as in the case of India. More »

MTO Biomass Direct Combustion Model.xls

June 24th, 2012 No Comments   Posted in renewable energy

MTO Biomass Direct Combustion Model.xls

Direct combustion of biomass system (furnace, boiler, steam turbine, generator) is carried out mostly in the countryside where biomass is abundant from agricultural activity such as paddy rice, corn fields, cotton fields, sugar cane fields, tree plantation and municipal solid waste (MSW). A 50-km radius of agricultural land can support around 6-12 MW of biomass power plant as in the case of India.

This MTO first-year tariff model for biomass direct combustion makes use of the basic assumptions of the country’s RE regulator for rated capacity (8.3 MW), capacity factor (75%), plant own use (10%), and transmission line loss (3%). More »

ADV Biomass Direct Combustion Model.xls

June 24th, 2012 No Comments   Posted in renewable energy

ADV Biomass Direct Combustion Model.xls

Direct combustion of biomass system (furnace, boiler, steam turbine, generator) is carried out mostly in the countryside where biomass is abundant from agricultural activity such as paddy rice, corn fields, cotton fields, sugar cane fields, tree plantation and municipal solid waste (MSW). A 50-km radius of agricultural land can support around 6-12 MW of biomass power plant as in the case of India.

This advanced feed-in-tariff model for biomass direct combustion makes use of the basic assumptions of the country’s RE regulator for rated capacity (1 x 8.3 MW), capacity factor (80%), plant own use (10%), and 0.20% plant degradation rate. More »