CDM Biomass Gasification Model2.xls

June 25th, 2012 1 Comment   Posted in renewable energy

CDM Biomass Gasification Model2.xls

In addition to the worksheets found in the ADV models of the regulator, 5 additional tabs or worksheets have been added (Capex, Opex, Revenues, Project IRR and Sensitivity) into the CDM model which is a financial evaluation without taxes (that distort the economic and technical performance) and debt (pure equity investment). For the RE project to benefit from CDM credits, the project IRR should not be more than 15% p.a.

Biomass gasification system is carried out mostly in the countryside where biomass is abundant from agricultural activity such as paddy rice, corn fields, cotton fields, sugar cane fields, tree plantation and municipal solid waste (MSW). A 400 mt/day of MSW could support around 28.5 MW of biomass gasification power plant. More »

MTO Biomass Gasification Model.xls

June 24th, 2012 1 Comment   Posted in renewable energy

MTO Biomass Gasification Model.xls

Biomass gasification system is carried out mostly in the countryside where biomass is abundant from agricultural activity such as paddy rice, corn fields, cotton fields, sugar cane fields, tree plantation and municipal solid waste (MSW). A 400 mt/day of MSW could support around 28.5 MW of biomass gasification power plant.

This MTO first-year tariff model for biomass gasification makes use of the basic assumptions of the country’s RE regulator for rated capacity (28.5 MW), capacity factor (75%), plant own use (7.85%), and transmission line loss (0.648%). More »

ADV Biomass Gasification Model.xls

June 24th, 2012 No Comments   Posted in renewable energy

ADV Biomass Gasification Model.xls

Biomass gasification system is carried out mostly in the countryside where biomass is abundant from agricultural activity such as paddy rice, corn fields, cotton fields, sugar cane fields, tree plantation and municipal solid waste (MSW). A 400 mt/day of MSW could support around 28.5 MW of biomass gasification power plant.

This advanced feed-in-tariff model for biomass gasification makes use of the basic assumptions of the country’s RE regulator for rated capacity (2 x 14.25 MW), capacity factor (75%), plant own use (7.85%), and 0.20% plant degradation rate. More »

Get Your Project Finance Models the Easy Way – Shopping Cart

Get Your Project Finance Models the Easy Way – Shopping Cart

You can now order on-line your project finance models the easy way – via the Shopping Cart.

Once you have decided to purchase, proceed to order via the shopping cart and pay thru PayPal thru your bank account or your credit card and download immediately the models. More »