CDM Solar PV Model2.xls

June 25th, 2012 1 Comment   Posted in renewable energy

CDM Solar PV Model2.xls

In addition to the worksheets found in the ADV models of the regulator, 5 additional tabs or worksheets have been added (Capex, Opex, Revenues, Project IRR and Sensitivity) into the CDM model which is a financial evaluation without taxes (that distort the economic and technical performance) and debt (pure equity investment). For the RE project to benefit from CDM credits, the project IRR should not be more than 15% p.a.

Solar energy is most available in countries near the equator. It can be harnessed using photo voltaic panels that when connected together in arrays can provide utility scale capacities of 5 MW modules and with 2 modules, could produce 10 MW of power in a given site. More »

MTO Solar PV Model.xls

June 24th, 2012 1 Comment   Posted in renewable energy

MTO Solar PV Model.xls

Solar energy is most available in countries near the equator. It can be harnessed using photo voltaic panels that when connected together in arrays can provide utility scale capacities of 5 MW modules and with 2 modules, could produce 10 MW of power in a given site.

This MTO first-year tariff model for Solar PV makes use of the basic assumptions of the country’s RE regulator for rated capacity (1.25 MW), capacity factor (15%), plant own use (5%), and transmission line loss (3%). More »

ADV Solar PV Model.xls

June 24th, 2012 No Comments   Posted in renewable energy

ADV Solar PV Model.xls

Solar energy is most available in countries near the equator. It can be harnessed using photo voltaic panels that when connected together in arrays can provide utility scale capacities of 5 MW modules and with 2 modules, could produce 10 MW of power in a given site.

This advanced model for Solar PV makes use of the basic assumptions of the country’s RE regulator for rated capacity (10 x 0.125 MW), capacity factor (14.3%), plant own use (3%), and 0.20% plant degradation rate. More »